Skip to Content

Lift Installation - Coca-Cola / Douglas Construction

In 2023, Total Lifting Solutions supplied and installed a two-stop goods lift for Douglas Construction and Engineering at a Coca-Cola facility. The project covered the full TLS scope: engineering drawings and structural detail, fabrication of the lift platform and shaft structure, and on-site installation coordinated with the builder’s program.

Goods lifts on production and warehousing sites like this one carry stock between levels so forklifts and stairs don’t have to — faster, and far safer for the people involved. Every TLS goods lift is engineered to comply with AS 1418.8, the Australian Standard for goods hoists.

Installation photo gallery

From modular frame sections to the assembled shaft — built in Hallam, assembled on site:

Goods lift frame components laid out ready for assembly
Folded steel sections ready for the shaft build
Goods hoist frame module assembled on site
The first shaft module standing beneath the mezzanine
Sill and guide sections going in at floor level
The shaft frame taking shape beneath the mezzanine
TLS installers working at height on the shaft columns
Scissor lift raised alongside the shaft columns
TLS installer positioning the top frame
The goods lift tower reaching full height
Scissor lift working alongside the hoist shaft
The shaft frame braced and aligned

Planning a goods lift on your site? Call Total Lifting Solutions: 0434 373 049.