Lift Installation - TasTAFE

This 2023 project delivered a four-stop, 1000 kg goods lift for TasTAFE’s Water and Energy Trades Centre of Excellence in Tasmania. With a 1.8 m × 1.8 m platform serving four levels, the lift moves training equipment and materials through the facility without tying up stairwells or manual handling.

A multi-stop lift in a public training facility carries extra weight on compliance and documentation, and this build ran through the full TLS project system — engineering drawings, assembly files, analysis and purchasing — before installation on site. Engineered to comply with AS 1418.8, the Australian Standard for goods hoists.

Installation photo gallery

From delivery to the finished four-stop lift — built in Hallam, installed by the TLS team:

Modular goods lift sections delivered to site by trailer
Crane lifting the goods lift base frame into position
Guide rails laid out as the crane positions the shaft steel
Crane work inside the TasTAFE facility
The four-stop shaft rising through the mezzanine levels
The goods lift tower in place at the mezzanine
The finished four-stop goods lift, clad and commissioned